East Wind Brokers will be ready to supply for Russian Wind Parks with more then 100mW of second hand (used) wind turbines during next 2-3 Years


Share this post

East Wind Brokers will be ready to supply for Russian Wind Parks with more then 100mW of second hand (used) wind turbines during next 2-3 Years

Several well-known type of wind turbine model will be presented for Russian large-scale Wind park projects. All costumers will be satisfied with quality of second hand wind turbines provided by East Wind Brokers.

For lager wind parks in Russia will be offered used turbines with rated power 1000 KW-2500 KW with the large rotors of 70/80/90 meters diameter and several different type of tower high (hub high) between 60 m up to 105 m.

Mane brands of used wind turbines will be: Vestas V80 , Vestas V90 , Nordex N80 , Nordex N90 , Enercon E70 ,  Enercon E66 ,  WinWind WWD 100/3 mW , and many other.

Such turbines were manufactured in 2003-2008 and these “OLD” turbines still in same level as a “NEW” to be competitive in the price and production of electricity power market. Estimating costs between used wind turbine and New can be approximately 1/3 of new wind turbine price. So for low effective wind park projects second hand wind turbine can be best option for investors.

For smaller and high challenge projects, which is required Off GRID system in Yakutia, Chukotka and other off-road locations will be offered small wind turbines with rated power up to 250 kw and tower of 30-45 m.

Considering that long distance from Europe to Russia would be very costly, East Wind Brokers arranging agreements with several mane transport companies who active in Europe, so to be ready to offer 10-15% lower transport costs for final costumer. These 10-15 % can save around 20.000-40.000 euros transportation costs per each large wind turbine.

East Wind Brokers recommends planning in advance to arrange large used wind turbines for the big project (10-30 MW), which will be finished even in 2 Years. There are many different reasons to start planning it even 2 years in advance. That could effect on lower price to purchase wind turbines, well planning time for dismantling and especially for transportation logistics to final destination.