The VetroOGK received a permit for the construction of the 120 MW Bondarevskaya wind farm in the Ipatovsky urban district, Stavropol Krai.
Obtaining the permit was preceded by an outline approval of the expert examination of design documentations issued by the Autonomous Unit of the Stavropol Krai “State construction expert assessment department” for the construction of WPP consisting of 24 wind turbines with a capacity of 2.5 MW each.
Successful undergoing of the examination confirms that the design documentation for the WPP construction facilities meets the results of engineering surveys and requirements of all technical regulations including environmental, sanitary and epidemiological requirements, fire safety requirements, regulatory and technical documentation of the Urban Development Code of the Russian Federation.
In terms of implementing the company’s strategy, the Stavropol Krai is a key region for NovaWind. At present, the region is building 400 MW of wind farms.
NovaWind is responsible for the Rosatom’s wind power assets and for delivering its wind strategy.